# Release of FY2024 Town Council Management Report (TCMR) – Operational Report

- **Source:** Ministry of National Development
- **Published:** 2025-06-13T04:00:00.000Z
- **Author:** Ministry of National Development
- **Original:** https://www.mnd.gov.sg/newsroom/press-releases/view/release-of-fy2024-town-council-management-report-(tcmr)---operational-report
- **Topics:** HDB & Public Housing, Sustainability & PropTech

## Featured rationale

Consistently strong estate operations may support public-housing liveability and resident confidence, potentially helping well-managed neighbourhoods retain their appeal to buyers.

## AI summary

All 17 pre-GE2025 Town Councils achieved “Green” ratings across estate cleanliness, maintenance, lift performance and S&CC arrears management for FY2024.

## Original article

The Ministry of National Development (MND) has released the FY2024 TCMR Operational Report on the performance of the 17 pre-General Election (GE) 2025 Town Councils (TCs) from April 2024 to March 2025.

Under the TCMR Operational Report, TCs are assessed across four operational indicators (Estate Cleanliness, Estate Maintenance, Lift Performance and Service & Conservancy Charges (S&CC) Arrears Management), using three colour bands - Green, Amber and Red.

Summary of FY2024 TCMR Results

All the pre-GE2025 TCs have scored “Green” for all four indicators in the FY2024 report, similar to the FY2023 TCMR. The results are summarised below. See Annex A for detailed breakdown of results. Details of the TCMR framework and banding can be found here.

TCMR Indicators

FY2024 Results

Estate CleanlinessAssesses the state of town cleanliness based on estate inspection observations made by HDB, such as the presence of stain, litter, bulky refuse and graffiti.

Estate Cleanliness

Assesses the state of town cleanliness based on estate inspection observations made by HDB, such as the presence of stain, litter, bulky refuse and graffiti.

All pre-GE2025 TCs scored “Green”

Estate MaintenanceAssesses the state of town maintenance based on estate inspection observations made by HDB, such as obstructions in common areas, unauthorised fixtures and damaged pipes/walls.

Estate Maintenance

Assesses the state of town maintenance based on estate inspection observations made by HDB, such as obstructions in common areas, unauthorised fixtures and damaged pipes/walls.

All pre-GE2025 TCs scored “Green”

Lift PerformanceAssesses the performance of lifts based on the frequency of faults affecting lift operations measured by the Tele-Monitoring System (TMS) and duration of downtime as a result of such faults.

Lift Performance

Assesses the performance of lifts based on the frequency of faults affecting lift operations measured by the Tele-Monitoring System (TMS) and duration of downtime as a result of such faults.

All pre-GE2025 TCs scored “Green”

S&CC Arrears ManagementAssesses the effectiveness of TCs’ S&CC arrears management based on the percentage of S&CC accounts and amount in arrears.

S&CC Arrears Management

Assesses the effectiveness of TCs’ S&CC arrears management based on the percentage of S&CC accounts and amount in arrears.

All pre-GE2025 TCs scored “Green”

Observations

Some observations for the indicators are as follows:

a. Estate Cleanliness. All pre-GE2025 TCs were banded “Green” as they all had less than four counts of cleanliness observations per block on average.

b. Estate Maintenance. All pre-GE2025 TCs were banded “Green” as they all had less than four counts of maintenance observations per block on average.

c. Lift Performance. All pre-GE2025 TCs were banded “Green” as they all had less than two lift faults per 10 lifts each month, and less than one hour of downtime per lift each month.

d. S&CC Arrears Management. All pre-GE2025 TCs were banded “Green” as they had less than 40 per cent of the monthly collectible S&CC for the town overdue and less than four in 100 households that owed arrears for three months or more.

Members of the public can refer to the FY2024 TCMR Operational Report here.

The Corporate Governance performance of the pre-GE2025 TCs from April 2024 to March 2025 will be published in the FY2024 TCMR Governance Report, that will be released in December 2025 after MND has received and reviewed the TCs’ audited financial statements and their auditor’s reports.

FY2025 TCMR Assessment

As the post-GE2025 TCs were formed on 30 May 2025 following the GE2025, the newly-formed and reconstituted TCs will require a transition period to stabilise their operations after the handover of Towns. Therefore, MND will not publish the TCMR Operational and Governance Reports for FY2025 (April 2025 to March 2026). During this period, MND will continue to monitor the performance of the TCs and share our feedback with the TCs to better support their transition. We will resume publication of the TCMR Reports from FY2026 (April 2026 to March 2027). This is consistent with the approach taken after GE2020.

Issued by: Ministry of National Development

Date: 13 June 2025

Annex A: Pre-GE2025 Town Councils’ Performance for the FY2024 TCMR Operational Report

## Chinese translation

> Translation model: grok_cli

### 发布2024财政年度市镇理事会管理报告（TCMR）——运营报告

国家发展部（MND）已发布2024财政年度TCMR运营报告，涵盖2025年大选前的17个市镇理事会（TC）在2024年4月至2025年3月期间的表现。

在TCMR运营报告下，市镇理事会按四项运营指标（住宅区清洁、住宅区维修、电梯表现，以及服务与保养费（S&CC）欠款管理）接受评估，并以绿、黄、红三色等级划分。

2024财政年度TCMR结果摘要

所有2025年大选前的市镇理事会在2024财政年度报告中四项指标均获“绿色”，与2023财政年度TCMR相同。结果摘要如下。详见附件A的结果明细。TCMR框架及等级划分详情见此处。

TCMR指标

2024财政年度结果

住宅区清洁根据建屋发展局（HDB）的住宅区巡查观察评估市镇清洁状况，例如污渍、垃圾、大型弃置物及涂鸦等。

住宅区清洁

根据建屋发展局（HDB）的住宅区巡查观察评估市镇清洁状况，例如污渍、垃圾、大型弃置物及涂鸦等。

所有2025年大选前的市镇理事会均获“绿色”

住宅区维修根据建屋发展局（HDB）的住宅区巡查观察评估市镇维修状况，例如公共区域障碍物、未经批准的装置以及损坏的管道/墙壁等。

住宅区维修

根据建屋发展局（HDB）的住宅区巡查观察评估市镇维修状况，例如公共区域障碍物、未经批准的装置以及损坏的管道/墙壁等。

所有2025年大选前的市镇理事会均获“绿色”

电梯表现根据远程监控系统（TMS）所计量的影响电梯运行的故障频率，以及此类故障造成的停运时长，评估电梯表现。

电梯表现

根据远程监控系统（TMS）所计量的影响电梯运行的故障频率，以及此类故障造成的停运时长，评估电梯表现。

所有2025年大选前的市镇理事会均获“绿色”

S&CC欠款管理根据S&CC账户欠款比例及欠款金额，评估市镇理事会S&CC欠款管理成效。

S&CC欠款管理

根据S&CC账户欠款比例及欠款金额，评估市镇理事会S&CC欠款管理成效。

所有2025年大选前的市镇理事会均获“绿色”

观察

各项指标的部分观察如下：

a. 住宅区清洁。所有2025年大选前的市镇理事会均获“绿色”等级，因为它们平均每座组屋楼的清洁相关观察次数均少于四次。

b. 住宅区维修。所有2025年大选前的市镇理事会均获“绿色”等级，因为它们平均每座组屋楼的维修相关观察次数均少于四次。

c. 电梯表现。所有2025年大选前的市镇理事会均获“绿色”等级，因为它们平均每月每10部电梯故障少于两次，且每部电梯每月停运时长少于一小时。

d. S&CC欠款管理。所有2025年大选前的市镇理事会均获“绿色”等级，因为逾期未缴金额占该市镇每月应收S&CC的比例低于40%，且连续欠款三个月或以上的家庭少于每100户中的4户。

公众可在此查阅2024财政年度TCMR运营报告。

2025年大选前市镇理事会在2024年4月至2025年3月期间的公司治理表现，将刊登于2024财政年度TCMR治理报告；该报告将于国家发展部收到并审阅各市镇理事会经审计财务报表及其审计师报告后，于2025年12月发布。

2025财政年度TCMR评估

由于2025年大选后的市镇理事会于大选后的2025年5月30日成立，新成立及重组的市镇理事会在市镇移交后需要过渡期以稳定运作。因此，国家发展部将不发布2025财政年度（2025年4月至2026年3月）的TCMR运营报告与治理报告。在此期间，国家发展部将继续监察市镇理事会表现，并向市镇理事会反馈意见，以更好地支持其过渡。我们将自2026财政年度（2026年4月至2027年3月）起恢复发布TCMR报告。这与2020年大选后采取的做法一致。

发布机构：国家发展部

日期：2025年6月13日

附件A：2025年大选前市镇理事会在2024财政年度TCMR运营报告中的表现
